What changed in the V2 IS300 / GS300 twin fuel pump hanger — stud connectors replacing the bulkhead connector's amperage ceiling, in-house hardcoat anodizing, Delrin isolators and a venturi machined into the pump bracket — plus a full assembly walkthrough including the eccentric pump outlet trick.
Step-by-step installation of the ASE CD009 to JZ adapter plate — seal installation using the pilot bushing, gasket and Permatex method, bolt lengths and torque specs, slave cylinder ordering, and J3 bell housing notching. Also clears up the long-running myths about cutting the spud and the input shaft tip.
Complete end-to-end assembly guide for the ASE 2JZ/1JZ to Jaguar ZF 8HP adapter kit — all three torque specs, the starter ring gear modification, trimming the transmission access window, the crank thread oil-wicking warning, and why the Jaguar converter's neutral offset means the adapter plate has to stay at 1 inch.